First-Fix Electrical Work: Conduits, Boxes and Planning
First fix electrical work means conduits, switch boxes and cable routes fitted before plastering. Learn how to plan circuits and points in your Pune home so the finished house works the way you live.
Written by H&H SPACES — a Pune-based construction and civil contracting company serving Pune and PCMC.
Illustrative imageLast updated: 2026-11-22
What first fix electrical work includes
First fix electrical work is the stage where all the hidden infrastructure of your home's electrical system is installed: conduits chased into walls and laid in slabs, switch and socket boxes fixed in position, and the routes for every cable planned and laid. It happens after the structure is up and before plastering begins, and like first fix plumbing, it is almost entirely concealed once the house is finished. The decisions you make at this stage decide where every light, fan, socket and appliance point will sit for decades, so it deserves more thought than it usually gets. A well-planned first fix means a house where switches fall naturally to hand and sockets are always where you need them.
Planning circuits room by room
The best way to plan circuits is room by room, thinking about how you will actually live in each space rather than copying a standard layout. In the living room, plan for the television point, a music system or set-top box, lamps on both sides of the sofa, and enough sockets for charging phones and laptops where people sit. In bedrooms, sockets on both sides of the bed matter more than a single point near the door. Kitchens need the most planning of all: the mixer, microwave, refrigerator, water purifier, chimney and hob each need their own point, and they should sit on separate circuits so one appliance tripping does not take the whole kitchen down.
Conduits, boxes and chasing
Conduits are the plastic or metal pipes that carry cables through your walls, and they exist so that a cable can be replaced later without breaking the wall. Conduits should be laid with gentle bends rather than sharp corners, and no conduit should be overfilled with cables, because overcrowding makes future replacement impossible and can cause overheating. Switch boxes and socket boxes are fixed into chases cut in the brickwork, and their depth and alignment decide whether the finished switches sit flush and level. Ask your electrician to show you the conduit runs and to keep a record of them, just as you would for plumbing. Good first fix work looks neat even before plastering: straight runs, properly fixed boxes, and conduits that do not cross plumbing lines.
Switch heights and positions that work
Switch heights and positions are small decisions with daily consequences. In most Pune homes, switches sit at a height that is comfortable for adults to reach without stretching, and the main room switch is placed just inside the door on the handle side so you can find it in the dark. Two-way switching is worth planning for staircases, long passages and bedrooms, where you want to switch a light on at one end and off at the other. In bathrooms, place switches outside the wet area and plan a separate point for the geyser and the exhaust fan. These are the details that separate a house that feels thoughtfully built from one that merely works.
Load planning and the main board
Load planning is the part of first fix electrical work that homeowners rarely see but should still ask about. Your electrician should be able to tell you the total connected load your home is designed for, how it is split across circuits, and what capacity the main board and the incoming supply need to be. Air conditioners, geysers and water pumps are heavy loads and should each have a dedicated circuit with the right cable size and protection. The main distribution board should be placed somewhere accessible, clearly labelled, and sized with spare ways for future additions such as an extra air conditioner or an electric vehicle charger. If your home will have an inverter or a solar connection later, mention it now, because the wiring for essential circuits is far easier to plan during first fix than to retrofit afterwards.
Safety details worth insisting on
Safety details are non-negotiable at this stage. Every circuit should be protected by the right miniature circuit breaker, and earth leakage protection should be provided for sockets and wet areas such as bathrooms and kitchens. Earthing deserves particular attention: a proper earth pit with the right electrode and a continuous earth wire to every socket is what protects your family from shocks, and it should be tested rather than assumed. All joints should be made inside proper junction boxes, never buried loose in plaster, and cable sizes should match the load they carry. These checks cost little at first fix stage and matter for the entire life of the house.
Checking the work before plastering
Before plastering begins, take a final walk through the house with your electrician and your own list of planned points. Confirm that every switch, socket, light and fan point is in place and at the height you agreed, that conduits are properly fixed and not overfilled, and that the main board location and the earthing arrangement are settled. Take photographs of every wall showing the conduit and box positions before they are covered, and keep those photos with your house documents, because they will save you from drilling into a live cable years later. H&H SPACES is a construction company in Pune doing civil, residential, commercial and turnkey work, and we treat first fix electrical planning as a design exercise, not just a wiring job. If you would like your home's electrical layout planned properly from the start, call us on +91 84840 57448 or message us on WhatsApp at +91 84850 54612.