Anti termite treatment during new construction protects your home from termite damage. Learn what the treatment involves and what to insist on from your contractor.

Written by H&H SPACES — a Pune-based construction and civil contracting company serving Pune and PCMC.

Anti-termite chemical treatment being applied to soil and foundation trenches at a construction site in PuneIllustrative image

Last updated: 2026-10-19

Why termites threaten Pune homes

Subterranean termites are a quiet but serious threat to homes in and around Pune. They live in underground colonies and build mud tubes to reach the cellulose in wood, cardboard, and even some building materials. Anti termite treatment in new construction matters because termites enter buildings from the soil through foundation cracks, construction joints, and the gaps around service pipes. The red laterite and murum soils common across Pune construction sites can harbour colonies, and once termites reach door frames, wardrobes, flooring, or roofing timber, the damage is usually discovered only after it is extensive. Treatment during construction is dramatically more effective than treatment after the building is complete, because the chemical barrier can be placed before the structure seals off access to the soil.

How pre-construction treatment works

Pre-construction anti-termite treatment is a chemical soil barrier, not a structural change. Approved termiticides are applied to the soil in a continuous barrier around and under the building so that termites cannot reach the structure without passing through treated earth. The chemical either repels termites or, in the case of newer non-repellent formulations, is carried back by foraging termites to the colony, which reduces the colony itself. The treatment is applied in stages that follow the construction sequence: the foundation trenches, the backfilled earth around foundations and plinth, the soil under the floor slab, and the external perimeter after backfilling. Each stage must be completed before that soil is covered by concrete or backfill, which is why timing and coordination with the contractor matter.

Stages of treatment during building

The standard treatment sequence follows the building stages closely. First, the bottom and sides of foundation trenches and pits are treated before the foundation concrete is poured. Next, after the foundation is cast and the earth around it is backfilled in layers, each layer receives treatment so the barrier is continuous up to the plinth level. Before the floor slab or flooring base is laid, the compacted soil or murum filling inside the plinth is treated across its full surface. Finally, after the external earthwork is finished and the plinth protection or apron is in place, a trench is dug around the building perimeter and treated to seal the barrier against the outer walls. Pipe entries, electrical conduits, and drainage outlets passing through the plinth need special attention because they create direct soil-to-structure bridges.

What to insist on from your contractor

As a homeowner, you should insist on a few clear commitments from your contractor or treatment agency. Ask for the treatment to be done by a licensed pest-control agency that issues a written treatment certificate with the chemical name, concentration, and areas treated. The treatment should follow the recognised standard practice for pre-construction soil treatment rather than a single token spraying. Make sure each stage is carried out at the right construction stage, not rushed into one visit after the slab is already cast. Photographs of each treated stage are worth keeping with your project records. A written warranty, commonly offered for several years, gives you recourse if termite activity appears during that period, and the warranty usually requires that you report activity promptly and allow the agency to inspect.

Common mistakes that make treatment fail

Several common mistakes cause even well-intentioned treatment to fail. The most frequent is applying the chemical after the soil has already been covered by backfill or concrete, which leaves gaps in the barrier. A second is treating only the foundation trenches and skipping the plinth filling or the external perimeter, so termites simply walk around the treated zone. Disturbing treated soil afterwards, for example by digging for a later drain or compound-wall footing inside the treated perimeter, breaks the barrier and the breach is rarely re-treated. Using the wrong concentration, either too weak to be effective or mixed casually on site without measurement, also undermines the work. Finally, storing timber, plywood, and wooden door frames on bare ground at the site during construction invites termites directly into your materials before the house is even finished.

Treatment for extensions and renovation

Extensions, additional floors, and renovations need their own treatment planning. Any new foundation work, such as footings for an added room or a staircase, exposes fresh untreated soil and should be treated the same way as a new build. When new construction joints meet the old building, the junction is a classic entry point and deserves careful treatment. For purely interior renovation of an existing termite-free home, the original barrier is usually undisturbed, but any plumbing or electrical work that breaks through the floor and into the soil below should be sealed and locally treated. If the existing building already shows termite activity, the colony should be dealt with before the renovation, because new woodwork installed into an infested structure will be attacked first.

How long the protection lasts

A properly applied pre-construction treatment generally protects the structure for several years, with the exact period depending on the chemical used, soil conditions, and whether the barrier was ever disturbed. The warranty from a reputable agency typically runs for a few years and can often be extended with periodic inspections. You should still keep the building termite-aware for its lifetime: avoid letting soil or garden beds pile up against external walls above the plinth, keep firewood and waste timber away from the building, and act quickly if you spot mud tubes on walls, hollow-sounding wood, or discarded wings near windows. If you are building a new home in Pune, make pre-construction anti-termite treatment a written item in your scope of work rather than a verbal promise. For construction guidance or a full build, H&H SPACES, a Pune construction company doing civil, residential, commercial and turnkey work, can be reached on +91 84840 57448 or WhatsApp at +91 84850 54612.